Curriculum Vitae
Hong Xuong Bao Thang
License: KTS-08-01842
Date of Birth: 01-05-1984
Lives in: Ho Chi Minh City, Vietnam
E-mail: hxbtarchitect@gmail.com
Cell Phone: [+84] 98 959 7881
Skype: hxbtdtna
Education
Ho Chi Minh City University of Architecture - Vietnam
Bachelor of Architecture - Good Degree
July 2007
Languages
English
Vietnamese
Background
With over 11 years of experience working in the architecture industry, I am a highly-skilled architect, and be well versed in both construction and detailing.
Besides, I offer a wealth of CAD and Revit knowledge, with strong CAD-BIM management abilities, and over 12 years using Revit, I have the experience to discuss, understand and implement the use of BIM on projects of all sizes. One of my goals for both practice and project teams is to facilitate the development of virtual building models that provide project teams with a high level of Confidence and Consistency while collaborating and coordinating.
Key experience
-
Architectural Design in many type of architecture such as amusement theme park, transportation, culture, resorts, hotels, high-rise mixed-use, apartment complexes, museums, residential, …
-
Excellent in managing and organizing documentation, digital information, and make the project workflow always operate smoothly and ensure achievement of professional drawings and quality.
-
Expert knowledge of BIM-VDC workflows and coordination all disciplines for constructability using innovative technology.
-
Understanding the Engineering languages and it needs as an Architect which is a key component to a successful cost saving and fast project.
Miscellaneous Skills
3D Animation
Presentation Layout
Graphic Design
Digital Painting
Drawing
Sketching
Scale Model Making
Calligraphy
Typography
Photography
Atkins - Ho Chi minh City, Vietnam -
Senior Architect
May 2018 - Till present
Responsible for coordination with the team under the design management of Atkins China Limited, in accordance to the project design programme.
Mode Design - Ho Chi Minh City, Vietnam -
Senior Architect - Project Manager
December 2015 - March 2017
Responsible for coordination with the team between Vietnam, Australia, and New Zealand.
Making a plan to develop the architecture firm in Vietnam market.
Participating in the design construction of buildings: Residential Planning, High-Rise Mix-used, Hotel, Apartment, Shopping Center.
WA PPP School, Perth: Cooperate with design team in Perth in CD stage.
Dien Phuc Thanh Apartments, HCMC: Conceptual design and visualization.
C30 Tan Binh Master Plan, HCMC: Conceptual design and visualization, scale model supervisor. This project was runner-up in international competition.
MT Hojgaard - Ho Chi Minh City, Vietnam -
Architectural Team Leader - CAD/BIM Manager
January 2015 - October 2015
Responsible for leading an Architectural Team, and making BIM Standards for Architecture Department in Vietnam to ensure the design, deliverable BIM model in high quality.
Created Architecture Development Plan for Architecture Department in Vietnam.
Posterminalen Copenhagen, Copenhagen: Cooperated with MT Hojgaard – Highrise Department in Copenhagen in making BIM Model for visualization, analysis, and presentation to Owner and Government.
Light House, Aarhus: Lead BIM team making 4D model for data extraction and analysis.
Marina Park, Copenhagen: Lead BIM team making 4D model for presentation and visualization.
SWA Vietnam - Ho Chi Minh City, Vietnam -
Project Architect - CAD Manager
August 2012 - December 2014
Responsible for managing the office design standards, and take the quality assurance role for all projects.
Set up the new CAD Standards for Design Team base on AIA Standards.
Participating in the design construction of buildings: High-Rise Mix-used, Hotel, Apartment, Department Store and Restaurant.
Pullman Saigon Centre: Cooperated with Kume Sekkei detailed design for construction documentation of exterior and interior to ensure the quality of design and aesthetics.
SC VivoCity Shopping Center: Cooperated with HOK, and other consultant for detailed design for construction documentation of exterior and interior to ensure the quality of design.
SSG Van Thanh Tower: 3D Revit modeling for design development.
Starcity Airport Hotel: 3D Revit modeling for design development and documentation.
Steelman Partners - Ho Chi Minh City, Vietnam -
Project Coordinator
December 2010 - December 2011
Responsible for project coordination in Vietnam, 2D detailed design for SD,DD, and CD stage
Participating in Hotel and Theme Park project in Vietnam
Happyland Long An: 2D CAD detailed design for construction documentation.
The Grand Ho Tram: 2D CAD for schematic design and design development.
ARTEC JSC - Ho Chi Minh City, Vietnam -
Architect
July 2007 - August 2010
Responsible for designing from conceptual to construction.
Volkswagen Office and Showroom, HCMC: Responsible for designing from conceptual to construction.
Phu Quoc International Airport, Phu Quoc: Responsible for designing from conceptual and presentation.
Duc Khai Tower, HCMC: Responsible for designing from conceptual, making architectural scale model, and presentation.
Software Skills
AutoCAD 2017 - 2D
Revit Architecture 2017
3Ds Max 2017 + Vray 3.4
Adobe Photoshop CC 2017
Adobe Illustrator CC 2017
Adobe InDesign CC 2017
Adobe Acrobat Pro DC
Adobe After Effects CC 2017
Adobe Premiere Pro CC 2017
SketchUp Pro 2017 + Vray
Lumion 6 Pro
Maxon Cinema 4D
Solibri
Microsoft Word 2016
Microsoft Excel 2016
Microsoft PowerPoint 2016
Microsoft Project 2016
Microsoft Movie Maker
Abilities
Teamwork
Leadership
Flexibility
Creativity
Planning
Organizing
Time Management
Document Control
Drawing Organization
Analytical
Research
Computer IT
Technical Literacy
Managing Multiple Priorities
Problem Solving
Hard Working
Responsibility
Willingess to Learn
Knowledge
Vietnam Building Code
International Building Code
Computer-Aided Design (CAD)
Building Information Modeling (BIM)
Virtual Design and Construction (VDC)
Level of Development (LOD)
MasterFormat Specification
UniFormant Classification
OmniClass Classification
BOMA Standards